Operational checklist for promoting enterprise operations pillars from Experimental to
Stable in docs/feature-status.md.
Status (2026-06-28): All 20 enterprise operations pillars promoted to Stable. SDKs published
at 0.4.2 (crates-sdk-v0.4.2, sdk-python-v0.4.2, npm-sdk-v0.4.2).
Implementation status: All per-pillar hardening items in stable-hardening-enterprise-ops.md are shipped in code and CI.
chmod +x scripts/enterprise_ops_field_soak_init.sh
chmod +x scripts/enterprise_ops_stable_promotion_gate.sh
chmod +x scripts/security_audit_prep.sh
# One-time: start 30-day soak clock
./scripts/enterprise_ops_field_soak_init.sh
# Generate audit prep packet for reviewers
./scripts/security_audit_prep.sh
# After soak + prep artifact exist (and external audit signed off):
./scripts/enterprise_ops_stable_promotion_gate.sh
The enterprise-ops-promotion-gate job runs the promotion gate with soak and audit checks skipped:
SPANDA_ENTERPRISE_OPS_SKIP_SOAK=1 \
SPANDA_ENTERPRISE_OPS_SKIP_AUDIT=1 \
./scripts/enterprise_ops_stable_promotion_gate.sh
| Variable | Default | Purpose |
|---|---|---|
SPANDA_FIELD_SOAK_START_FILE |
.spanda/field-soak-start.txt |
UTC soak start (YYYY-MM-DD) |
SPANDA_FIELD_SOAK_MIN_DAYS |
30 |
Minimum elapsed days |
SPANDA_SECURITY_AUDIT_PREP_FILE |
.spanda/security-audit-prep.json |
Audit prep artifact |
SPANDA_ENTERPRISE_OPS_SKIP_SOAK |
0 |
Skip soak elapsed check |
SPANDA_ENTERPRISE_OPS_SKIP_AUDIT |
0 |
Skip audit prep file check |
SPANDA_ENTERPRISE_OPS_SKIP_SMOKE |
0 |
Skip enterprise_ops_smoke.sh |
enterprise_ops_smoke.sh — E1–E4 Control Center API surfacefailover_drill_smoke.sh — device pool failover drillota_fleet_soak.sh — quick OTA fleet soak (SPANDA_OTA_FLEET_SOAK_QUICK=1)| Gate | Action |
|---|---|
| Third-party audit | Engage reviewer using security-audit-prep.json packet; record sign-off in change management |
| Production releases | ✅ SDK 0.4.2 on crates.io, PyPI, npm; ✅ desktop 0.4.2 (desktop-v0.4.2 → GitHub Release at promotion); current desktop 0.6.3 (desktop-v0.6.3) — control-center-versioning.md |
| Feature status | ✅ Done (2026-06-28) — all enterprise ops pillars Stable |